|
More photos from the assembly of the BPS
|
|
![]() ![]() ![]()
More photos from the assembly of the BPS After putting together the battery pack, the SBM was installed (on the side of the pack). Testing of the of the switching relays was done and the proper function of the DC/AC inverter and the AC/DC charger was verified. | |
|
|
|



