GWL Power - PowerBox, Switchboard with built-in battery

Short demonstration of LiFePO4 PowerBox installation in standard rack. We are presenting this idea on Czech fair ForArch 18.9.2018 - 22.9.2018.

Combination of BPS (BackUp power source), BMS (Battery Management System) and UPS (Uninterruptible Power Supply). The status and mangement of the rack is done via HTTP on any device.

Using Winston cells 48V/100Ah setup, https://www.ev-power.eu/Winston-40Ah-...

(0 votes)
This article was helpful
This article was not helpful

Comments (0)
Post a new comment
 
 
Full Name:
Email:
Comments:
CAPTCHA Verification 
 
Please enter the text you see in the image into the textbox below. This is required to prevent automated registrations and form submissions.

Help Desk Software by Kayako Case
ERROR: This domain name does not match domain registered in the license key file (apache5.gwl.eu), allowed domains: 127.0.0.1,192.168.5.36,support.i4wifi.cz,support.gwl.eu,kayako.gwl.eu, please change the product path to match the domain under Admin CP > Settings > General Settings
This product will not work properly unless untill that value is changed.

For more information please contact Kayako support at https://my.kayako.com