Our Battery Testing Setup

 

Our Battery Testing Setup

Equipment used (from left to right): 

  • Asus EEE PC connected to 4 digital multimeters: logging the voltage levels of the cells during the tests.
  • HP XE3 notebook connected to the RT-BMS for management of the charge and discharge levels.
  • Four VA-18B multimeters with USB PC connection.
  • The tested batteries with RT-BMS CBU modules and the RT-BMS Master unit.
  • 12V auxiliary battery to power the RT-BMS.
  • 2500W DC to AC invertor to create the loads for the cells.
  • 12V 20A charger to charge cells back to full.

Any questions?  Be sure to let us know!


Help Desk Software by Kayako Case
ERROR: This domain name does not match domain registered in the license key file (apache5.gwl.eu), allowed domains: 127.0.0.1,192.168.5.36,support.i4wifi.cz,support.gwl.eu,kayako.gwl.eu, please change the product path to match the domain under Admin CP > Settings > General Settings
This product will not work properly unless untill that value is changed.

For more information please contact Kayako support at https://my.kayako.com